Top running crane worker planning critical lift

broken image
broken image

If the actual information at the lifting site does not tally with the lifting plan, you should stop the operation until the plan has been updated and re-approved.You should never deviate or vary from the approved lifting plan.Sketch of the lifting zone (showing position of lifting equipment, crew and load) and.Requirements to erect or dismantle lifting equipment (if any).Lifting crew (including their roles and competencies).

broken image

Your lifting plan should include, but not limited to, the following elements: load capacity chart, range diagram, rigging method)įor complex lifts, additional engineering design efforts are necessary to ensure that the lifting operation is conducted safely. Having a solid plan of action is, indeed, the best way to avoid paying too much every time the crane needs to be used for a job. For example, a lifting plan would ensure that the crane is safely deployed and operated, and the lifting crew are clear about their roles and responsibilities.īefore you start any lifting operation, you must prepare the following: A lifting plan provides a systematic approach towards planning a lift and ensures that the lifting operation is properly managed.

broken image